🚦 V62.0 — Pre-Race Production Readiness Gate

整合 V60 OS Health + V61 Leakage Audit + Decision Output Integrity。Read-only / Advisory-only。
Race Date Venue
Readiness State
FAIL
Readiness Score
9.0
Critical / Warning
2 / 3
Production Gate
BLOCKED

Production Signals

OS State / Health
GUARDED / 52
Ranking / Dashboard
0 / 0
Memory / Cluster
0 / 0
Passed Checks
4 / 9

Certification Checks

SOURCE_STATUS

FAIL CRITICAL

PRE_RACE_CONTRACT

PASS CRITICAL

RESULTS_ISOLATION

PASS CRITICAL

OS_HEALTH

FAIL WARNING

DECISION_OUTPUT

FAIL CRITICAL

MEMORY_INPUT

FAIL WARNING

PATTERN_INPUT

FAIL WARNING

NUMERIC_INTEGRITY

PASS CRITICAL

IMMUTABILITY_CONTRACT

PASS CRITICAL

Findings

CRITICAL · SOURCE_STATUS

Source snapshot is not ready.

WARNING · OS_HEALTH

V60 OS health is below production threshold.

CRITICAL · DECISION_OUTPUT

No final chairman ranking/dashboard output is available.

WARNING · MEMORY_INPUT

No chairman memory records are available.

WARNING · PATTERN_INPUT

No pattern clusters are available.

Safety Contract: PRE-RACE ONLY | V61 PASS REQUIRED | NO DB WRITE | NO SCHEMA CHANGE | NO LIVE-WEIGHT CHANGE